Ampcontrol delivered a complete, fit-for-purpose dewatering solution, supplying the transformer, substation and pump control infrastructure while integrating customer-supplied pumps into the overall design.
BACKGROUND
A Tier 1 mining customer engaged Ampcontrol to support an upcoming in-seam dewatering project requiring a reliable solution for a critical underground mining area. While the customer had an initial concept, they sought Ampcontrol's expertise to evaluate lessons learned from similar operations and develop the most effective approach for their site.
Unlike conventional surface-based water management systems, site conditions required a more responsive underground solution to manage water accumulation at the source. The project demanded a fit-for-purpose design that would support safe, continuous operations while improving overall water management performance.
SOLUTION
Although the dewatering system was only expected to operate for approximately 18 months, its location within a critical mining area meant reliability was non-negotiable. Any loss of pumping capability had the potential to create significant operational risk, requiring a solution that balanced reliability, redundancy and cost efficiency.
Working closely with the customer, Ampcontrol assessed multiple design options, including increased storage capacity through a larger sump and fully redundant pumping configurations. The final solution was engineered to maximise system availability while meeting site budget and operational requirements.
Ampcontrol designed and manufactured a fully integrated 11kV/1.05kV ONAN 4-Outlet Substation and Ex d 2-Outlet Pump Starter, purpose-built for underground coal mining applications and compliant with relevant Australian Standards.
Key features included:
- Stainless steel construction for enhanced durability in harsh underground environments
- High and low voltage segregation for improved safety
- Schneider and ABB switchgear
- Ampcontrol IPE protection relays with OCS cassettes
- Galvanised skid-mounted design with integrated bunding and towing capability
- Flameproof Ex d pump starter suitable for Group I, EPL Mb applications
- Independent outlet protection and pump control
- RTX control for single or dual supply operation
- Hinged enclosure doors supporting safe, efficient maintenance by a single operator
OUTCOME
Ampcontrol delivered a complete, fit-for-purpose dewatering solution, supplying the transformer, substation and pump control infrastructure while integrating customer-supplied pumps into the overall design.
By combining operational experience with a collaborative engineering approach, Ampcontrol helped the customer mitigate risk, improve water management capability and maintain operational continuity in a critical mining area.