COMPLETE LONGWALL OVERHAUL

Resources
Projects LONGWALL-CENTURION-MINE Longwall-DCB

Our latest case study shows how nine Ampcontrol sites came together to deliver a fully integrated, end‑to‑end electrical overhaul for the Centurion Mine longwall, far beyond a typical refurbishment.

BACKGROUND

The customer required a comprehensive overhaul of their longwall electrical system ahead of a return to production. The scope extended beyond a traditional longwall overhaul, requiring:

  • Replacement of critical enclosures with new, re‑handed Exd assemblies
  • Overhaul of every electrical component across the entire package
  • Rapid delivery within a condensed schedule
  • Multi‑discipline engineering, testing, and commissioning support
  • Cross‑site collaboration across Ampcontrol’s national operations


The project demanded precision, speed, and seamless coordination across Australia.

SOLUTION

To meet the customer’s requirements, Ampcontrol mobilised teams from nine operations across NSW, QLD and VIC, delivering a highly integrated solution that covered engineering, manufacturing, overhaul, testing, installation, and commissioning assistance.

Key Deliverables

Custom Equipment & Overhauls

  • New Exd (re‑handed) enclosures – built by Mining Solutions, NSW
  • Complete pump electrics overhaul – by Mining Solutions QLD and Underground Field Service NSW and QLD
  • Overhaul Longwall substation – completed by Mining Solutions QLD and Power Infrastructure NSW
  • Monorail and face power cables – manufactured and overhauled by Cables NSW and Cables QLD
  • Main power transformers – overhauled by our Mining Solutions QLD and Power Infrastructure NSW
  • Lighting enclosures and lights – upgraded and overhauled by Ringwood, VIC


Development Equipment – built by Mining Solutions, NSW included:

  • 5 x 1kV FLP 8 Outlet OCS DCBs
  • 4 x 11kV/1.05kV FLP 4 Outlet OCS 2MVA Substations
  • 4 x 11kV FLP 2 Outlet Section Isolators


Control, Automation & Monitoring

  • iMAC and VAA system overhauls – delivered by Applications, Cameron Park
  • Gas monitoring system – completed by Applications, Cameron Park
  • WiFi system integration – in collaboration with a 3rd party provider


Engineering & Project Delivery

  • Functional safety reviews - completed by our in house functional safety team in NSW
  • Automation upgrades
  • Full project management and engineering
  • System and compatibility testing
  • Installation and commissioning assistance


All work was completed within the customer’s compressed schedule, ensuring the longwall was ready for safe and reliable operation.

OUTCOME

The successful delivery of this project highlights Ampcontrol’s capability to provide complete end‑to‑end solutions for the underground mining sector. By leveraging the collective expertise of nine operational teams, we delivered a fully integrated overhaul that supports:

  • Long-term asset reliability
  • Compliance with AS/NZS standards
  • Enhanced operational safety
  • Increased production readiness

This project is a clear demonstration of Ampcontrol’s ability to manage complex, multi‑disciplinary longwall overhauls from design through to commissioning.


Empowering Safer, Smarter Underground Mining 👉 https://ampcontrolgroup.com/services/underground-mining-services 

Projects

Latest projects

Contact us

Have a question, want to work with us, or know more about our solutions? We’d love to hear from you!

We’re available to call 24/7 for service and support or submit an enquiry and our team will get in touch to assist you.

1300 267 373
Contact Us
Download Your file below
Download